Confederation Heights: Realize the Potential

Canada Lands Company and Public Services and Procurement Canada (PSPC) worked together, along with a broad range of stakeholders, to develop a comprehensive Master Plan for Confederation Heights. The Master Plan will establish a vision for the site, which is expected to transition over the next 25 years from an automobile-oriented federal employment hub into a mixed-use, sustainable community.
About the Partners

Canada Lands Company is a self-financing federal Crown corporation that specializes in real estate development and attraction management. Its mission is to obtain the best economic and community value from former government properties and the management and operations of certain attractions such as the CN Tower and Downsview Park in Toronto, and the Montreal Science Centre and the Old Port of Montreal.

Public Services and Procurement Canada (PSPC) is responsible for managing office space for federal departments and agencies across Canada. Its portfolio currently includes a significant portion of lands and buildings in Confederation Heights.
Objectives of the Master Plan
The current City of Ottawa Confederation Heights Secondary Plan is approximately 25 years old and requires an update to ensure that it meets the needs of a growing city. The goal is to turn Confederation Heights into a complete community that provides amenities, connections, housing, and employment that will appeal to a wide and diverse population.
The area’s history and context, including proximity to the Rideau River, National Capital Commission parkland, and planned public transit infrastructure will shape the master plan and address aspects such as land uses, building heights, densities, site design, sustainability, housing, parks and open space, heritage considerations, as well as pedestrian, cycling, transit and vehicular connections and wayfinding.
Overview of the Site

Confederation Heights is currently a federal employment area located approximately five kilometres south of Ottawa’s downtown core, totalling approximately 188 hectares/465 acres. The site is bound by the Rideau River to the north and west, Data Centre Road and Sawmill Creek to the east, and Brookfield Road to the south. Property owners on and adjacent to the study area include the Government of Canada, the National Capital Commission, Health Canada, Canada Post, the City of Ottawa, and CN Rail.

Learn
Learn more about the history and evolution of the site here 
Next Steps
Canada Lands Company has worked to keep the community informed about the Confederation Heights redevelopment through public engagement activities that began in November 2021. Throughout this period, community members and stakeholders have been able to share input during both the master planning process. The Final Draft Master Plan, presented at a public Open House in January 2026, reflects this work and will help guide the long-term development of the area. Since 2025, the City of Ottawa have joined these public engagement activities, allowing for community members and stakeholders to provide feedback to the secondary plan process.
As the project moves into the municipal approval phase, the City of Ottawa will now be leading the next steps for the Confederation Heights Secondary Plan.
To continue staying in the know on next steps, visit the City of Ottawa’s Confederation Heights Secondary Plan page.
Indigenous Land Acknowledgement
We recognize that the City of Ottawa is located on the traditional and unceded territory of the Algonquin Anishinabe People who have lived on this land for millennia. We extend our respect to all First Nations, Inuit and Métis peoples for their valuable past and present contributions to this land. We also recognize and respect the cultural diversity that First Nations, Inuit and Métis people bring to the City of Ottawa.

Canada Lands Company and Public Services and Procurement Canada (PSPC) worked together, along with a broad range of stakeholders, to develop a comprehensive Master Plan for Confederation Heights. The Master Plan will establish a vision for the site, which is expected to transition over the next 25 years from an automobile-oriented federal employment hub into a mixed-use, sustainable community.
About the Partners

Canada Lands Company is a self-financing federal Crown corporation that specializes in real estate development and attraction management. Its mission is to obtain the best economic and community value from former government properties and the management and operations of certain attractions such as the CN Tower and Downsview Park in Toronto, and the Montreal Science Centre and the Old Port of Montreal.

Public Services and Procurement Canada (PSPC) is responsible for managing office space for federal departments and agencies across Canada. Its portfolio currently includes a significant portion of lands and buildings in Confederation Heights.
Objectives of the Master Plan
The current City of Ottawa Confederation Heights Secondary Plan is approximately 25 years old and requires an update to ensure that it meets the needs of a growing city. The goal is to turn Confederation Heights into a complete community that provides amenities, connections, housing, and employment that will appeal to a wide and diverse population.
The area’s history and context, including proximity to the Rideau River, National Capital Commission parkland, and planned public transit infrastructure will shape the master plan and address aspects such as land uses, building heights, densities, site design, sustainability, housing, parks and open space, heritage considerations, as well as pedestrian, cycling, transit and vehicular connections and wayfinding.
Overview of the Site

Confederation Heights is currently a federal employment area located approximately five kilometres south of Ottawa’s downtown core, totalling approximately 188 hectares/465 acres. The site is bound by the Rideau River to the north and west, Data Centre Road and Sawmill Creek to the east, and Brookfield Road to the south. Property owners on and adjacent to the study area include the Government of Canada, the National Capital Commission, Health Canada, Canada Post, the City of Ottawa, and CN Rail.

Learn
Learn more about the history and evolution of the site here 
Next Steps
Canada Lands Company has worked to keep the community informed about the Confederation Heights redevelopment through public engagement activities that began in November 2021. Throughout this period, community members and stakeholders have been able to share input during both the master planning process. The Final Draft Master Plan, presented at a public Open House in January 2026, reflects this work and will help guide the long-term development of the area. Since 2025, the City of Ottawa have joined these public engagement activities, allowing for community members and stakeholders to provide feedback to the secondary plan process.
As the project moves into the municipal approval phase, the City of Ottawa will now be leading the next steps for the Confederation Heights Secondary Plan.
To continue staying in the know on next steps, visit the City of Ottawa’s Confederation Heights Secondary Plan page.
Indigenous Land Acknowledgement
We recognize that the City of Ottawa is located on the traditional and unceded territory of the Algonquin Anishinabe People who have lived on this land for millennia. We extend our respect to all First Nations, Inuit and Métis peoples for their valuable past and present contributions to this land. We also recognize and respect the cultural diversity that First Nations, Inuit and Métis people bring to the City of Ottawa.
-
Final Draft Master Plan Open House – January 22, 2026 – COMPLETED
Share Final Draft Master Plan Open House – January 22, 2026 – COMPLETED on Facebook Share Final Draft Master Plan Open House – January 22, 2026 – COMPLETED on X (formerly Twitter) Share Final Draft Master Plan Open House – January 22, 2026 – COMPLETED on Linkedin Email Final Draft Master Plan Open House – January 22, 2026 – COMPLETED link
Thank you to everyone who attended our January 22 Open House to review the Final Draft Master Plan for Confederation Heights. For those who could not attend the event and would like provide feedback, please see below.
- Please review the Final Draft Master Plan and the associated boards describing key aspects of the plan.
- Provide your feedback by completing the survey.
This survey can be completed at your leisure and at your own pace until February 6th, 2026, at which time an ‘As We Heard It’ report will be compiled highlighting the engagement findings and published thereafter.This final feedback will be carefully considered and incorporated, where appropriate, into Canada Lands Company’s Final Master Plan. The Final Master Plan will inform the City-led Secondary Plan for the area, expected to be considered by the Planning and Housing Committee in May 2026, followed by City Council in June 2026. Learn more by visiting the City of Ottawa’s Secondary Plan page.
The Confederation Heights Team
Thank you to everyone who attended our January 22 Open House to review the Final Draft Master Plan for Confederation Heights. For those who could not attend the event and would like provide feedback, please see below.
- Please review the Final Draft Master Plan and the associated boards describing key aspects of the plan.
- Provide your feedback by completing the survey.
This survey can be completed at your leisure and at your own pace until February 6th, 2026, at which time an ‘As We Heard It’ report will be compiled highlighting the engagement findings and published thereafter.This final feedback will be carefully considered and incorporated, where appropriate, into Canada Lands Company’s Final Master Plan. The Final Master Plan will inform the City-led Secondary Plan for the area, expected to be considered by the Planning and Housing Committee in May 2026, followed by City Council in June 2026. Learn more by visiting the City of Ottawa’s Secondary Plan page.
The Confederation Heights Team
- Please review the Final Draft Master Plan and the associated boards describing key aspects of the plan.
-
Final Draft Master Plan Presentation – January 22, 2026
Share Final Draft Master Plan Presentation – January 22, 2026 on Facebook Share Final Draft Master Plan Presentation – January 22, 2026 on X (formerly Twitter) Share Final Draft Master Plan Presentation – January 22, 2026 on Linkedin Email Final Draft Master Plan Presentation – January 22, 2026 link
Canada Lands Company and the City of Ottawa will be jointly hosting a drop-in session to review the Final Draft Master Plan for Confederation Heights – which has been shaped by community input to reflect a shared vision for this exciting mixed-use redevelopment.
Public engagement regarding the redevelopment of Confederation Heights began 2021 and included the general public,stakeholders, the project’s technical and public advisory committees, a close collaboration with Public Services and Procurement Canada and more recently working with the City of Ottawa,that has now led to the Final Draft Master Plan. Canada Lands Company has also worked closely with local elected officials to ensure alignment with community needs.
The session will also allow participants to review the City of Ottawa’s Secondary Plan draft policy directions and to learn more about next steps.
Join us at:
Hellenic Event Centre – 1315 Prince of Wales Drive, Ottawa, ON K2C 1N2
January 22, 2026, from 6:00 pm to 9:00 pm
Registration would be appreciated and can be completed here: https://www.eventbrite.ca/e/confederation-heights-january-2026-buttes-de-la-confederation-janvier-2026-tickets-1976465310950
For more information on the City of Ottawa Secondary Plan for the area visit:
https://engage.ottawa.ca/confederation-heights-secondary-planCanada Lands Company and the City of Ottawa will be jointly hosting a drop-in session to review the Final Draft Master Plan for Confederation Heights – which has been shaped by community input to reflect a shared vision for this exciting mixed-use redevelopment.
Public engagement regarding the redevelopment of Confederation Heights began 2021 and included the general public,stakeholders, the project’s technical and public advisory committees, a close collaboration with Public Services and Procurement Canada and more recently working with the City of Ottawa,that has now led to the Final Draft Master Plan. Canada Lands Company has also worked closely with local elected officials to ensure alignment with community needs.
The session will also allow participants to review the City of Ottawa’s Secondary Plan draft policy directions and to learn more about next steps.
Join us at:
Hellenic Event Centre – 1315 Prince of Wales Drive, Ottawa, ON K2C 1N2
January 22, 2026, from 6:00 pm to 9:00 pm
Registration would be appreciated and can be completed here: https://www.eventbrite.ca/e/confederation-heights-january-2026-buttes-de-la-confederation-janvier-2026-tickets-1976465310950
For more information on the City of Ottawa Secondary Plan for the area visit:
https://engage.ottawa.ca/confederation-heights-secondary-plan -
Closed - Draft Master Plan - Share your feedback - July 2025
Share Closed - Draft Master Plan - Share your feedback - July 2025 on Facebook Share Closed - Draft Master Plan - Share your feedback - July 2025 on X (formerly Twitter) Share Closed - Draft Master Plan - Share your feedback - July 2025 on Linkedin Email Closed - Draft Master Plan - Share your feedback - July 2025 linkCLOSED: This discussion has concluded.
If you didn't get a chance to join us in person for our public engagement meeting and draft master plan workshop or would like to provide additional feedback to what you may have already contributed, the project team is pleased to offer you an additional opportunity to provide feedback. This interactive activity can be completed at your leisure and at your own pace until August 31, 2025 at which time an ‘As We Heard It’ report will be compiled highlighting the engagement findings and published thereafter.
This workshop specifically focused on the Confederation Heights Draft Master Plan for redevelopment of the approximately 188 hectares (465 acres) of federal lands.
What to expect about this interactive activity?
After viewing the presentation on this page and the images of the Draft Master Plan, the project team is seeking your perspective through a questionnaire on the Confederation Heights Draft Master Plan with respect to four (4) themes:• Master Plan
• Parks and Open Space
• Active Transportation
• Heritage
We are seeking your input which will be added to the voices of those who already took part during our public and stakeholder engagement exercises.
Many thanks and we look forward to hearing your ideas!
The Confederation Heights TeamIf you didn't get a chance to join us in person for our public engagement meeting and draft master plan workshop or would like to provide additional feedback to what you may have already contributed, the project team is pleased to offer you an additional opportunity to provide feedback. This interactive activity can be completed at your leisure and at your own pace until August 31, 2025 at which time an ‘As We Heard It’ report will be compiled highlighting the engagement findings and published thereafter.
This workshop specifically focused on the Confederation Heights Draft Master Plan for redevelopment of the approximately 188 hectares (465 acres) of federal lands.
What to expect about this interactive activity?
After viewing the presentation on this page and the images of the Draft Master Plan, the project team is seeking your perspective through a questionnaire on the Confederation Heights Draft Master Plan with respect to four (4) themes:• Master Plan
• Parks and Open Space
• Active Transportation
• Heritage
We are seeking your input which will be added to the voices of those who already took part during our public and stakeholder engagement exercises.
Many thanks and we look forward to hearing your ideas!
The Confederation Heights Team -
Draft Master Plan - Interactive Workshop June 2025
Share Draft Master Plan - Interactive Workshop June 2025 on Facebook Share Draft Master Plan - Interactive Workshop June 2025 on X (formerly Twitter) Share Draft Master Plan - Interactive Workshop June 2025 on Linkedin Email Draft Master Plan - Interactive Workshop June 2025 linkCanada Lands Company and the City of Ottawa invites the community to an interactive workshop to review and discuss the draft master plan for the redevelopment of Confederation Heights.
About this event
After concluding a review and analysis of the three concept options presented in November 2023, and with the help of several consultation opportunities with the general public, various stakeholders and the National Capital Commission, Canada Lands Company has prepared a draft master plan and has begun working with the City of Ottawa as it launches a Secondary Plan for the Confederation Heights area.
Participants at this workshop will review the draft master plan and learn more about the City’s Secondary Plan process and how their input will help inform a final master plan, anticipated to be presented to City Council in 2026 in coordination with the City-initiated Secondary Plan process.
Space is limited, register early.
To accommodate your schedule, this in-person meeting will be held twice in one day:- Register here for the Afternoon Session: Tuesday, June 24, 2025 from 12:00 pm to 3:00 pm
- Register here for the Evening Session: Tuesday, June 24, 2025 from 6:00 pm to 9:00 pm
For those who are short on time and cannot stay for the workshop, you can drop-in to chat with members of the project team.
LOCATION: Hellenic Event Centre, at 1315 Prince of Wales Drive, Ottawa, ON K2C 1N2
Pre-recorded Presentation and Interactive Activity
If you can’t join us in person, you will be able to visit our website and provide your input through an online activity, which will be available shortly after the workshop.Canada Lands Company and the City of Ottawa invites the community to an interactive workshop to review and discuss the draft master plan for the redevelopment of Confederation Heights.
About this event
After concluding a review and analysis of the three concept options presented in November 2023, and with the help of several consultation opportunities with the general public, various stakeholders and the National Capital Commission, Canada Lands Company has prepared a draft master plan and has begun working with the City of Ottawa as it launches a Secondary Plan for the Confederation Heights area.
Participants at this workshop will review the draft master plan and learn more about the City’s Secondary Plan process and how their input will help inform a final master plan, anticipated to be presented to City Council in 2026 in coordination with the City-initiated Secondary Plan process.
Space is limited, register early.
To accommodate your schedule, this in-person meeting will be held twice in one day:- Register here for the Afternoon Session: Tuesday, June 24, 2025 from 12:00 pm to 3:00 pm
- Register here for the Evening Session: Tuesday, June 24, 2025 from 6:00 pm to 9:00 pm
For those who are short on time and cannot stay for the workshop, you can drop-in to chat with members of the project team.
LOCATION: Hellenic Event Centre, at 1315 Prince of Wales Drive, Ottawa, ON K2C 1N2
Pre-recorded Presentation and Interactive Activity
If you can’t join us in person, you will be able to visit our website and provide your input through an online activity, which will be available shortly after the workshop. -
Launch of the Confederation Heights Secondary Plan process
Share Launch of the Confederation Heights Secondary Plan process on Facebook Share Launch of the Confederation Heights Secondary Plan process on X (formerly Twitter) Share Launch of the Confederation Heights Secondary Plan process on Linkedin Email Launch of the Confederation Heights Secondary Plan process linkSince the launch of the collaboration project, Canada Lands Company and Public Services and Procurement Canada (PSPC) have been working towards a new vision for the site by engaging stakeholders, Indigenous communities and the public to realize its potential. Part of this work included PSPC determining its future at Confederation Heights as part of the government’s portfolio reduction strategy. After careful analysis, the government has decided to significantly reduce the federal employment footprint at Confederation Heights resulting in additional land available for housing.
With these decisions made, Canada Lands will now take the lead in finalizing the Master Plan for the site. The Company is using various tools to expedite housing development, including collaborating with the City of Ottawa and the National Capital Commission on the Master Plan and Secondary Plan approval processes in parallel.
Looking ahead, Canada Lands’ priority at Confederation Heights is to enable housing and other uses as quickly as possible. The first phase of development will focus on parcels that are most easily developed for housing. For more information, the Frequently Asked Questions page has been updated. Canada Lands looks forward to continuing community engagement this spring and summer as the project progresses.Since the launch of the collaboration project, Canada Lands Company and Public Services and Procurement Canada (PSPC) have been working towards a new vision for the site by engaging stakeholders, Indigenous communities and the public to realize its potential. Part of this work included PSPC determining its future at Confederation Heights as part of the government’s portfolio reduction strategy. After careful analysis, the government has decided to significantly reduce the federal employment footprint at Confederation Heights resulting in additional land available for housing.
With these decisions made, Canada Lands will now take the lead in finalizing the Master Plan for the site. The Company is using various tools to expedite housing development, including collaborating with the City of Ottawa and the National Capital Commission on the Master Plan and Secondary Plan approval processes in parallel.
Looking ahead, Canada Lands’ priority at Confederation Heights is to enable housing and other uses as quickly as possible. The first phase of development will focus on parcels that are most easily developed for housing. For more information, the Frequently Asked Questions page has been updated. Canada Lands looks forward to continuing community engagement this spring and summer as the project progresses. -
Confederation Heights Newsletter - August 2024
Share Confederation Heights Newsletter - August 2024 on Facebook Share Confederation Heights Newsletter - August 2024 on X (formerly Twitter) Share Confederation Heights Newsletter - August 2024 on Linkedin Email Confederation Heights Newsletter - August 2024 link
Welcome to the Confederation Heights newsletter. We hope you are enjoying the summer sun with friends and family.
As work continues to create a preferred Master Plan concept option for Confederation Heights, the project team would like to provide you with some updates since presenting the three draft concept options to the public late last year. Here is a summary of activities.
Optimizing the Federal Real Property Portfolio
Public Services and Procurement Canada (PSPC) is developing a long-term plan to optimize the space under its responsibility, lower operating costs and reduce greenhouse gas emissions. The aim is to reduce the PSPC-administered office portfolio by 50% over the next 10 years.
PSPC already declared two federal buildings at Confederation Heights as surplus to the Government’s needs: the Sir Charles Tupper Building and 1500 Bronson Avenue. Recently, 875 Heron Road, another federal building at the site, was added to the list of surplus buildings for disposal.
PSPC continues this work with the expectation that additional buildings will be identified as surplus in future, which may include other properties within Confederation Heights. The project team will keep you updated.
You can visit PSPC's Optimizing our real property portfolio website to learn more about the department's portfolio plans and the building disposal process.

Status of the Three Master Plan Concept Options
The feedback that the project team has and continues to receive is incredibly valuable and informs much of the work that is being done towards a preferred Master Plan concept option. This feedback comes from the public, the consulting team, the Public Advisory Committee, the Technical Advisory Committee, stakeholders and approval authorities.
Since the fall, the team has completed technical analysis on the three concept options in collaboration with an interdisciplinary team. This analysis considers urban planning and design best practices, landscape architecture, ecology, heritage, sustainability, transportation, accessibility, and wayfinding among others. The analysis conducted is done through the lens of the project’s vision and guiding principles, with a goal of identifying which elements from each option best achieve the overall Master Plan vision.
Following the workshops last fall, the team has been engaged further with various stakeholders, including Carleton University, the RA Centre, Health Canada, National Capital Commission, and the City of Ottawa. Additionally, as we consider social equity within the Master Plan, we are pleased to be integrating our consultant retained to establish a social equity strategy for Confederation Heights.
With the Federal Budget 2024 highlighting CLC’s important role in helping to provide much-needed housing in Ottawa by getting federal lands such as Confederation Heights ready for development, the project team anticipates being able to present a preferred Master Plan concept option to the public in late fall 2024 or early 2025.
We look forward to seeing you later this year, and hope you have an enjoyable rest of your summer.
The Confederation Heights Team

Welcome to the Confederation Heights newsletter. We hope you are enjoying the summer sun with friends and family.
As work continues to create a preferred Master Plan concept option for Confederation Heights, the project team would like to provide you with some updates since presenting the three draft concept options to the public late last year. Here is a summary of activities.
Optimizing the Federal Real Property Portfolio
Public Services and Procurement Canada (PSPC) is developing a long-term plan to optimize the space under its responsibility, lower operating costs and reduce greenhouse gas emissions. The aim is to reduce the PSPC-administered office portfolio by 50% over the next 10 years.
PSPC already declared two federal buildings at Confederation Heights as surplus to the Government’s needs: the Sir Charles Tupper Building and 1500 Bronson Avenue. Recently, 875 Heron Road, another federal building at the site, was added to the list of surplus buildings for disposal.
PSPC continues this work with the expectation that additional buildings will be identified as surplus in future, which may include other properties within Confederation Heights. The project team will keep you updated.
You can visit PSPC's Optimizing our real property portfolio website to learn more about the department's portfolio plans and the building disposal process.

Status of the Three Master Plan Concept Options
The feedback that the project team has and continues to receive is incredibly valuable and informs much of the work that is being done towards a preferred Master Plan concept option. This feedback comes from the public, the consulting team, the Public Advisory Committee, the Technical Advisory Committee, stakeholders and approval authorities.
Since the fall, the team has completed technical analysis on the three concept options in collaboration with an interdisciplinary team. This analysis considers urban planning and design best practices, landscape architecture, ecology, heritage, sustainability, transportation, accessibility, and wayfinding among others. The analysis conducted is done through the lens of the project’s vision and guiding principles, with a goal of identifying which elements from each option best achieve the overall Master Plan vision.
Following the workshops last fall, the team has been engaged further with various stakeholders, including Carleton University, the RA Centre, Health Canada, National Capital Commission, and the City of Ottawa. Additionally, as we consider social equity within the Master Plan, we are pleased to be integrating our consultant retained to establish a social equity strategy for Confederation Heights.
With the Federal Budget 2024 highlighting CLC’s important role in helping to provide much-needed housing in Ottawa by getting federal lands such as Confederation Heights ready for development, the project team anticipates being able to present a preferred Master Plan concept option to the public in late fall 2024 or early 2025.
We look forward to seeing you later this year, and hope you have an enjoyable rest of your summer.
The Confederation Heights Team
-
Round 2 Public Engagement Wrap Up
Share Round 2 Public Engagement Wrap Up on Facebook Share Round 2 Public Engagement Wrap Up on X (formerly Twitter) Share Round 2 Public Engagement Wrap Up on Linkedin Email Round 2 Public Engagement Wrap Up link
On behalf of Canada Lands Company, Public Services and Procurement Canada, and our entire consulting team, I am pleased to advise that the As We Heard It Report from the November 23, 2023 Public Engagement Sessions and the Self-guided Virtual Tour is now available in the Document Library of the Confederation Heights Project Website (https://engage.clc-sic.ca/25963/widgets/108831/documents/128521).
All of the input received will be extremely helpful in guiding us to the next phase of the Master Plan exercise. We thank you for your time and dedication to the master planning process and look forward to keeping you updated on next steps.
On behalf of Canada Lands Company, Public Services and Procurement Canada, and our entire consulting team, I am pleased to advise that the As We Heard It Report from the November 23, 2023 Public Engagement Sessions and the Self-guided Virtual Tour is now available in the Document Library of the Confederation Heights Project Website (https://engage.clc-sic.ca/25963/widgets/108831/documents/128521).
All of the input received will be extremely helpful in guiding us to the next phase of the Master Plan exercise. We thank you for your time and dedication to the master planning process and look forward to keeping you updated on next steps.
-
Closed - Online Excercise : Master Plan Potential Concept Options
Share Closed - Online Excercise : Master Plan Potential Concept Options on Facebook Share Closed - Online Excercise : Master Plan Potential Concept Options on X (formerly Twitter) Share Closed - Online Excercise : Master Plan Potential Concept Options on Linkedin Email Closed - Online Excercise : Master Plan Potential Concept Options link
If you didn't get a chance to join us in person during the master planning workshop, or would like to add to what you may have already contributed, the project team is pleased to offer you an additional opportunity to provide feedback. This interactive activity can be completed at your leisure and at your own pace until January 15, 2024, at which time an ‘As We Heard It’ report will be compiled highlighting the engagement findings and published thereafter.
These public workshop style meetings specifically focused on the Confederation Heights Master Plan potential concept options for redevelopment of the approximately 188 hectares (465 acres) of federal lands.
What to expect about this interactive activity?
After viewing the presentation and the video on this page, the project team is seeking your perspective through a questionnaire on the three concept options entitled:
Concept Theme 1: Gateway to the Capital
Concept Theme 2: Recreational District
Concept Theme 3: Intensify and Urbanize
Although each concept is different, the presentation will assist you in understanding the unique features of each approach. We are seeking your input which will be added to the voices of those who already took part during our public and stakeholder engagement exercises.
Many thanks and we look forward to hearing your ideas!
The Confederation Heights Team
If you didn't get a chance to join us in person during the master planning workshop, or would like to add to what you may have already contributed, the project team is pleased to offer you an additional opportunity to provide feedback. This interactive activity can be completed at your leisure and at your own pace until January 15, 2024, at which time an ‘As We Heard It’ report will be compiled highlighting the engagement findings and published thereafter.
These public workshop style meetings specifically focused on the Confederation Heights Master Plan potential concept options for redevelopment of the approximately 188 hectares (465 acres) of federal lands.
What to expect about this interactive activity?
After viewing the presentation and the video on this page, the project team is seeking your perspective through a questionnaire on the three concept options entitled:
Concept Theme 1: Gateway to the Capital
Concept Theme 2: Recreational District
Concept Theme 3: Intensify and Urbanize
Although each concept is different, the presentation will assist you in understanding the unique features of each approach. We are seeking your input which will be added to the voices of those who already took part during our public and stakeholder engagement exercises.
Many thanks and we look forward to hearing your ideas!
The Confederation Heights Team
-
Confederation Heights Concept Options Workshop - Our Engagement Continues
Share Confederation Heights Concept Options Workshop - Our Engagement Continues on Facebook Share Confederation Heights Concept Options Workshop - Our Engagement Continues on X (formerly Twitter) Share Confederation Heights Concept Options Workshop - Our Engagement Continues on Linkedin Email Confederation Heights Concept Options Workshop - Our Engagement Continues linkCanada Lands Company and Public Services and Procurement Canada would like to thank those who participated in our November 23 Concept Options workshop sessions. Your valued input is greatly appreciated.
If you were unable to attend or wish to provide additional input, we have an interactive activity for you to take part in, coming soon on our project website platform.
You will be notified once the information is uploaded.In the meantime, we appreciate your interest and participation and look forward to seeing you at our next engagement event.
Confederation Heights Project Team
Canada Lands Company and Public Services and Procurement Canada would like to thank those who participated in our November 23 Concept Options workshop sessions. Your valued input is greatly appreciated.
If you were unable to attend or wish to provide additional input, we have an interactive activity for you to take part in, coming soon on our project website platform.
You will be notified once the information is uploaded.In the meantime, we appreciate your interest and participation and look forward to seeing you at our next engagement event.
Confederation Heights Project Team
-
Canada Lands Company and Public Services and Procurement Canada invites the community to an interactive workshop to review and discuss three draft master plan concept options.
Share Canada Lands Company and Public Services and Procurement Canada invites the community to an interactive workshop to review and discuss three draft master plan concept options. on Facebook Share Canada Lands Company and Public Services and Procurement Canada invites the community to an interactive workshop to review and discuss three draft master plan concept options. on X (formerly Twitter) Share Canada Lands Company and Public Services and Procurement Canada invites the community to an interactive workshop to review and discuss three draft master plan concept options. on Linkedin Email Canada Lands Company and Public Services and Procurement Canada invites the community to an interactive workshop to review and discuss three draft master plan concept options. linkAbout this event
After completing two years of study, conversations, consultations and engagement, Canada Lands Company and Public Services and Procurement Canada are now ready to present three draft master plan concept options for Confederation Heights. The partners are hosting an in-person workshop for the community and the public to review and discuss the three options.
Space is limited, register early.
To accommodate your schedule, this in-person meeting will be held twice in one day:
- Register here for the Afternoon Session: Thursday, November 23, 2023 from 12:00 pm to 3:00 pm
- Register here for the Evening Session: Thursday, November 23, 2023 from 6:00 to 9:00 pm
LOCATION: St. Elias Centre at 750 Ridgewood Avenue
Please indicate in advance of the meeting if you wish to sit at a French-speaking table.
Pre-recorded Presentation and Interactive Activity
If you can’t join us in person, you can go to our website and provide your input though an online activity, which will be available shortly after the workshop.
What to expect
The project team will present three draft concept plan options that have been developed over the last two (2) years with input from many stakeholders.
The purpose of the in-person workshop is to get input on the three options. All input received from you and other stakeholders will inform a preferred final draft concept.
Working towards a final Master Plan
Next steps for the Confederation Heights project team will be to piece together the draft final master plan that will be presented at a follow up public information meeting anticipated for mid-2024.
About this event
After completing two years of study, conversations, consultations and engagement, Canada Lands Company and Public Services and Procurement Canada are now ready to present three draft master plan concept options for Confederation Heights. The partners are hosting an in-person workshop for the community and the public to review and discuss the three options.
Space is limited, register early.
To accommodate your schedule, this in-person meeting will be held twice in one day:
- Register here for the Afternoon Session: Thursday, November 23, 2023 from 12:00 pm to 3:00 pm
- Register here for the Evening Session: Thursday, November 23, 2023 from 6:00 to 9:00 pm
LOCATION: St. Elias Centre at 750 Ridgewood Avenue
Please indicate in advance of the meeting if you wish to sit at a French-speaking table.
Pre-recorded Presentation and Interactive Activity
If you can’t join us in person, you can go to our website and provide your input though an online activity, which will be available shortly after the workshop.
What to expect
The project team will present three draft concept plan options that have been developed over the last two (2) years with input from many stakeholders.
The purpose of the in-person workshop is to get input on the three options. All input received from you and other stakeholders will inform a preferred final draft concept.
Working towards a final Master Plan
Next steps for the Confederation Heights project team will be to piece together the draft final master plan that will be presented at a follow up public information meeting anticipated for mid-2024.
-
2021
Confederation Heights: Realize the Potential has finished this stageProject launch
-
2022-2023
Confederation Heights: Realize the Potential has finished this stageDraft concept plans development
-
2024-2025
Confederation Heights: Realize the Potential is currently at this stageDraft Master Plan
-
2025-2026
this is an upcoming stage for Confederation Heights: Realize the PotentialFinal Master Plan & Secondary Plan
-
2026+
this is an upcoming stage for Confederation Heights: Realize the PotentialRegulatory approvals, site servicing and construction